OUR PROJECTS

Project Title:Oil Increment Program GOSP-3

Client NAME: Saudi Aramco
Location: EnglanD, UK

Project DATE: 07/2022

Project Summary:

The South Ghawar field consists of 3 main areas namely Uthmaniyah, Hawiyah, and Haradh. The Haradh area is on the southmost part of the field while Uthmaniyah lies on the north. In between the two areas lie the Hawiyah area. The facilities in the South Ghawar Producing Department are comprised of 14 Gas Oil Separation Plants (GOSP), each having wet crude handling (WCH) facilities and gas gathering (GG) facilities. Haradh GOSP-3 is currently designed for 300 MBCD at 30% water cut. It has been forecasted that there will be an increase in production rate within Haradh GOSP-3 up to 420 MBCD starting from 2026. it is therefore necessary to develop extra processing capacity to accommodate the increase in the production. The objective of this project (BI-10-16921) is to provide facilities required to deliver and process additional 120 MBCD of crude production from HARADH GOSP-3 area of the South Ghawar field. Oil production from HRDH GOSP-3 area is planned to be increased above the GOSP oil handling facility. The increase in production will be sustained for 14 years with a maximum oil rate of 420 MBCD.

Project Status: ONGOING

Project Title: HAZID/ENVID/HAZOP/SIL for Liverpool Bay Area Carbon Capture and Storage Project

Client: Eniprogretti, UK
Location: Basingstoke, UK

Project date: 06/2022

Project Summary:

The HyNet Project has grown in scale with a number of new industrial emitters emerging from the NW Region. This led to a change in the definition of the ‘Flexible’ case from the Pre-FEED 3MTPA plateau to 4.5MTPA with expansion to 10MTPA.  The LBA CCS T&S Project development strategy foresees a gas phase transportation of the CO2 streams in the early stage of operation with additional compression. In the later stage of operation, CO2 streams will be transported in liquid phase and further compression system will be required. The trigger point for the transition from gas to liquid phase flow will be one of the following:

  • Storage reservoir pressures increase to the point that liquid phase flow is required to continue to store.
  • System flow rate increases to the level that flow in an existing part of the pipeline network is constrained

Part of the LBA CCS T&S Project development strategy is to make use of existing assets wherever possible, including pipelines and offshore platforms.  A range of compression / pressure boosting configurations have been considered to explore how to manage the transition from ‘free flow gas’ mode to the dense phase transport offshore. The following development

stages have been identified:

  • Stage 1: Free Flow from Stanlow to Reservoirs (Gas Phase)
  • Stage 2: Compression at Point of Ayr (Gas Phase Operating Mode)
  • Stage 3: Pressure Control at Douglas Platform (Gas Phase Operating Mode)

Stage 4: Dense Phase Transportation (Offshore Only)

Project Status: COMPLETED

Project Title: HAZOP/SIL for Borouge 4 Project - EPC Package 5 - XLPE2 Unit

Client: Abu DHABI Polymers Co. Ltd. (Borouge)
Location: MILAN, ITALY

Project date: 05/2022

Project Summary:

Abu Dhabi Polymers Company Ltd., (“Borouge”) is a Joint Venture Company between Abu Dhabi National Oil Company (ADNOC) and Borealis A/S (BOREALIS). Borouge is a leading provider of innovative plastics solutions using advanced technologies with world-class production facilities of Ethylene, Polyethylene, Propylene and Polypropylene in the United Arab Emirates. Today, Borouge and Borealis have a combined annual production capacity of approximately 8 million tonnes of polyethylene and polypropylene.  Borouge operates and maintains a Petrochemical Plant (“Plant”) located in the Ruwais Industrial Area, approximately 240 kilometers west of Abu Dhabi City. Following the successful start-up of the Borouge 3 project in 2015, Borouge’s site in Ruwais, UAE, is now the world’s largest integrated polyolefin complex, with production capacity having doubled to 4.5 million tonnes per year with plans to increase capacity at its facilities to 10 million tonnes per year by 2030

Project Status: COMPLETED

Project Title: HAZOP/SIL for Sentuo Gas Pipeline Project

Client: Ghana Gas/Sentuo
Location: Accra, Ghana

Project date: 05/2022

Project Summary:

The purpose of the Engineering Design for Aksa– Sentuo Pipeline, carried out by Danq Services Ltd, is to provide a connection from the gas supply point in Aksa to the demand point of Funjian Sentuo

Project Status: COMPLETED

Project Title: HAZOP for. Installation of SGC-I and WIP-I in EK-I Area (2076), Installation of SGC-III and WIP-III in SK Area (2075) Installation of WIP-IV in SK Area (2077)

Client: Kuwait Oil Company (KSC)
Location: LONDON, UK

Project date: 03/2022 - 04/2022

Project Summary:

The project scope of work includes the design, construction, pre-commissioning, commissioning, and operation of a new combined Separation Gathering Centre III (SGC-III) and Water Injection Plant III (WIP-III) for the project “EF-2076, 2075, 2077: Installation of SGC-III and WIP-III in SK Area”. To maintain production and handle surplus produced water, a new combined Separation Gathering Centre III (SGC-III) and Water Injection Plant III (WIP-III) is to be constructed.  The project will include the associated gathering pipeline network with manifolds, the injection pipeline network with manifolds, and pipelines connecting to existing facilities for effluent water import, wet crude export, low pressure gas export and plant utilities.  The SGC-III shall have a total liquid handling capacity of 600 MBLPD.  The WIP-III shall have an injection capacity of 600 MBWPD (Injection 450 MBWPD and Disposal 150 MBWPD).

Project Status: COMPLETED

PROJECT TITLE: Modular Oil Treating and Desalting Train Number 2 (MOTD 2) project.

Client: ExxonMobil Iraq Limited
Location: ABERDEEN, UK

Project DATE: 03/2022

Project Summary:

Active and Passive Fire Protection Philosophy

The WQ1 field produces crude through existing facilities located at Degassing Stations DS6, DS7, and DS8. The existing oil processing facility at DS6 consists of five operational oil trains with dedicated flare stacks and a crude oil storage facility. The scope of the MOTD 2 project includes the installation of a new process unit at DS6 to increase oil production by a minimum of 50kstbpd per train. The new oil train will be designed to process wet crude with a water cut of up to 40% by volume. The MOTD2 facilities consists of the various process and utility equipment required to facilitate effective separation, dehydration and desalting of the inlet fluids. This includes the separation vessels, crude heaters, process pumps and chemical injection skids. The design and integration of the greenfield MOTD2 facilities to the existing DS6 brownfield process and utility systems will be designed and commissioned by BL Energy

Project Status: COMPLETED

Client: Petrofac Engineering and Production Ltd
Location: ABERDEEN, UK

Project Status: 11/2021 - 01/2022

Project Summary:

  • EnQuest-Kittiwake-C3 Caisson Swage Repair
  • Slot 9 Flowline Hook-up
  • CFAP Export Pig Launcher Interlock Upgrade
  • Replace Water in Condensate Analysers
  • Hydraulic System Performance Upgrade Modifications

Project Status: COMPLETED

Project Title: HAZOP for UQUA Export Gas Compressor Installation FEED

Client: Accugas/Savannah Energy
Location: LAGOS, NIGERIA

Project date: 10/2021

  • HAZOP study was to check and investigate the design of the project to identify any potential hazard and operability problems which could arise particularly through deviations from the design intent. 

Project Status: COMPLETED

Project Title: Mini-HAZOP for Otakikpo Temporary Production Facility

Client: Green Energy International Limited
Location: PORT HARCOURT, NIGERIA

Project date: 07/2021

– (HAZOP) study is to check and investigate the design of the project to identify any potential hazard and operability problems which could arise particularly through deviations from the design intent

Project Status: COMPLETED

Project Title: Accelerated Sapele AG Compressors Project

Client: Montego/Seplat
Location: LAGOS, NIGERIA

Project date: 06/2021

(HAZOP) study is to check and investigate the design of the project to identify any potential hazard and operability problems which could arise particularly through deviations from the design intent

Project Status: COMPLETED

Project Title: Develop Integrated (Design & Operational) Safety case

Client: MRS/Regad star
Location: LAGOS, NIGERIA

Project date: 01/2021

Project Summary:

(HAZOP) Workshop, Conduct Operating Phase HAZID & MAH Identification, Develop Facility Bowties for major Accident Hazards

Project Status: COMPLETED

Project Title: Safety and Constructability Studies for Engineering, Procurement, Construction, and Installation (EPCI) of Modularized Oil and Gas Facilities at ABURA OML 65

Client: NPDC/IGPES
Location: BENIN, NIGERIA

Project date: 10/2020

This consist of; – HAZOP Studies – HAZID Studies – SIL Studies – LOPA – Constructability Reviews

Project Status: COMPLETED

Project Title: Incident Investigation

Client: AMNI Petroleum Dev. Comp Ltd
Location: LAGOS, NIGERIA

Project date: 09/2020

: Department of Petroleum Resources has requested for an independent investigation to the fire incident which occurred on princess Aweni FPSO with the following directives and scope as contained in the DPR letter;

Project Status: COMPLETED

Project Title: HAZID for HI Development Project;

Client:Shell Petroleum Development Company
Location: LAGOS, NIGERIA

Project date: 04/2020

The HAZID study is used to identify the hazards associated with the Project facilities and recommend improvements, modifications, or further studies where present preventive/mitigated measures require additional ones.

Project Status: COMPLETED

Project Title: Review and Development of Integrated HSE Management System

Client:AMNI Petroleum Dev. Comp Ltd
Location: LAGOS, NIGERIA

Project date: 11/2019

Project Summary:

Development of standard HSE-MS documents integrating the 11 basic elements of HSE-SMS, Development of Hazard Management Plan/Philosophy, Development of Emergency Shutdown Philosophy etc

Project Status: COMPLETED

Project Title: HAZOP Study for the Filtration Unit At FRM LACT in OML 30

Client:IGPES/Heritage
Location: LAGOS, NIGERIA

Project date: 07/2019

Project Summary:

OTK Facilitated the HAZOP Study for the Filtration Unit At FRM LACT in OML 30 to identify the hazards Inherent in the design in order to meet its design objectives 

Project Status: COMPLETED

Project Title:HAZID & BOWTIE studies

Client: Pillar Oil Ltd
Location: WARRI, NIGERIA

Project date: 05/2019

Project Summary:

POL engaged the services of Otormeking Engineering and Design Nigeria Limited to carry out Hazard Identification (HAZID) and Bow Tie analysis on the Umuseti Production Facility Upgrade Project to ensure that the risks associated with the MAH’s are As Low AS Reasonably Practicable (ALARP)

Project Status: COMPLETED

Project Title: Otakikpo 1-Million Barrel Onshore terminal Project

Client: Green Energy International Ltd
Location: ABUJA, NIGERIA

Project date: 04/2019

Project Summary:

The primary objective of the HAZOP Study is to identify the hazards inherent in the operations of the 1-Million Barrel Onshore terminal Project to meet its design objectives.

Project Status: COMPLETED

Project Title: Meji GGCP Debottlenecking Project HSE Studies.

Client:IESL & Chevron Nigeria Ltd (CNL) .
Location: LAGOS, NIGERIA

Project Status: COMPLETED

Flare Dispersion Study is to assess the potential un-ignited flammable gas impact on manned areas and equipment from the HP and LP flare release on Meji GGCP and also to assess the potential un-ignited flammable gas impact on manned areas and equipment from surge vessel vent in the event of a PSV lift on the HP separator.

Design Safety Case Report that will include but not limited to the following information: Facilities description, Environmental considerations, Human factor engineering, Safety In Design, Safety Management System

Project Title: Okan GGCP Debottlenecking Project HSE Studies

Client:NETCO & Chevron Nigeria Ltd (CNL) .
Location: LAGOS, NIGERIA

Project Status: COMPLETED

Fire and Explosion Analysis (FEA) will cover the evaluation of the detailed engineering design impact of GGCP Debottlenecking project including flare facility and bridge links to GGCP (Flare Bridge and Okan PP Bridge). Fire Protection Analysis (FIREPRAN) will address the type and  magnitude  of potential fire incidents and to determine type of active fire protection and level of passive fire protection necessary for safety of personnel and assets due to direct or indirect results of changes, replacements and modifications. Dropped Object Study (DOS) will evaluate the potential risk associated with dropped objects considering frequency of lifts, probability of drops, and severity of impact.

Design Safety Case Report that will include but not limited to the following information: Facilities description, Environmental considerations, Human factor engineering, Safety in Design, Safety Management System Operational Safety Case Report will demonstrate that Operations risks are reduced to ALARP.  These include HES risks, Operations risks and other potential consequences in the facility which is critical to the business.

Project Title: Onshore Excravos Export System Project

Client:Gramen Petroserve Nig & Chevron Nigeria Ltd.
Location: LAGOS, NIGERIA

Project Status: COMPLETED

Fire and Explosion Analysis (FEA) will; Analyse credible fire and explosion hazards due to hydrocarbon release events. Assess the consequence and frequency of credible fire and explosion hazards due to hydrocarbon release events. Assess credible fire and explosion escalation events. Recommend measures for mitigating the consequences of fire and explosion events.

Fire Protection Analysis (FIREPRAN) will address the type and magnitude of potential fire incidents and to determine type of active fire protection and level of passive fire protection necessary for safety of personnel and assets due to direct or indirect results of changes, replacements and modifications. Dropped Object Study (DOS) will evaluate the potential risk associated with dropped objects considering frequency of lifts, probability of drops, and severity of impact.

Noise and Vibration Study will control and minimise the risk of hearing and physical damage to personnel, and by ensuring the audibility of warning signals and communications and the provision of acceptable working conditions.

Valve Criticality Analysis is conducted to; It provides the designers with a clear guidance on valve access requirements. It enhances the overall   design review process because it alleviates unnecessary, lengthy discussions, on valve accessibility as the design progresses to completion. It ensures that operational and maintenance requirements are addressed when deciding on the location of a valve.

Safety Critical Elements and Performance Standards involves identification of Major Accident Hazards (MAHs); selection of the Safety Critical Elements by identifying items, equipment’s or structures which can cause, contribute to, prevent or help recover from a major accident event; and to develop the performance standards for the identified SCEs

Project Title: Otakikpo EPF Project

Client:Lekoil and Green Energy.
Location: PORT HARCOURT, NIGERIA

Project Status: COMPLETED

OTK was commissioned to HAZOP the Early Production Facility that will identify the hazards inherent in the design in order to meet its design objectives

Project Title: Offshore Excravos Export System Project Dropped Object Study (DOS)

Client:Deltatec Engi/Chevron Nig Ltd.
Location: lagos, NIGERIA

Project Status: COMPLETED

Offshore Excravos Export System Project

Dropped Object Study (DOS) will evaluate the potential risk associated with dropped objects considering frequency of lifts, probability of drops, and severity of impact.

Diving Operations Safety Study involves a unique combination of occupational health and safety issues performed in an unforgiving environment where errors can quickly develop into fatal accidents.

Pipeline Oil Spill Trajectory Model is essential tool for risk assessment relating to potential environmental impacts  in  sensitive  areas  and  for planning spill response measures. In the event of a spill, the models can be used operationally to assist the response team

Project Title: Otakikpo Integrated HAZOP Project

Client:Lekoil/GEIL.
Location: ph, NIGERIA

Project Status: COMPLETED

Otakikpo Integrated HAZOP Project: OTK was commissioned to HAZOP the Integrated EPF HAZOP that will identify the hazards inherent in the design in order to meet its design objectives

Project Title: HAZOP for Egbema 3KM NAG Flowline

Client:NPDC.
Location: benin, NIGERIA

Project Status: COMPLETED

OTK Facilitated HAZOP for Egbema 3KM NAG Flowline to identify the hazards Inherent in the design in order to meet its design objectives.

Project Title: Risk Assessment for pipeline

Client:Gramen/Chevron Nig Ltd.
Location: warri, NIGERIA

Project Status: COMPLETED

OTK facilitated the Risk Assessment for the 30” Onshore Swamp Pipeline and the Horizontal Directional Drilling (HDD) which is part of Escravos Export System Project.

Project Title: HAZOP Study

Client:NPDC.
Location: LAGOS, NIGERIA

Project Status: COMPLETED

OTK Facilitated the HAZOP Study for the Tie-in of Oghareki – Sapele flowlines to SEPLAT’s Sapele flowstation inlet manifold to identify the hazards Inherent in the design in order to meet its design objectives.

Project Title: Risk Assessment

Client: Deltatec Engineering & Chevron Nig.
Location: LAGOS, NIGERIA

Project Status: COMPLETED

OTK facilitated the Risk Assessment to identify the hazards in the installation of the concrete mattresses at proposed pipeline route and all crossing locations prior to commencement of pipelay of the Escravos Export System Project

Project Title: Risk Based Inspection (RBI)

Client: Monipulo Limited
Location: PH NIGERIA

Project Status: COMPLETED

The Risk Based Inspection (RBI) will enable the client to manage the facility more efficiently considering corrosion and life cycle of all the equipment’s installed, pipelines, vessels, platforms etc

Project Title: Risk Assessment

Client: Deltatec Engineering & Chevron Nig Ltd
Location: LAGOS NIGERIA

Project Status: COMPLETED

OTK facilitated the Risk Assessment to identify the hazards in the Pipeline Installation and Pipeline Pre-Commissioning of the Escravos Export System Project

Project Title: Operational Safety Case Report

Client: Pillar Oil and Gas Limited
Location: LAGOS NIGERIA

Project Status: ONGOING

Operational Safety Case Report will demonstrate that Operations risks are reduced to ALARP.  These include HES risks, Operations risks and other potential consequences in the facility which is critical to the business.

Project Title: Pre- Start Up Audit (PSUA).

Client: Green Energy International Ltd/LEKOIL
Location: PH, NIGERIA

Project Status: COMPLETED

The PSUA provides a final checkpoint for the Permanent Early Production Facilities at Otatikpo to confirm that all appropriate equipment, elements, and processes have been addressed satisfactorily and the facility is safe and ready to start up.

Project Title:Otakikpo LPG Extraction Plant

Client: Green Energy International Ltd
Location: ABUJA, NIGERIA

Project Status: COMPLETED

Otakikpo LPG Extraction Plant; The primary objective of the HAZOP Study is to identify the hazards inherent in the operations of the LPG Extraction plant in order to meet its design objectives

Project Title: Technical Safety Studies and Procedures/Philosophies

Client: Green Energy International Ltd/LEKOIL
Location: PH, NIGERIA

Project Status: COMPLETED

The following are been developed; Operational Safety Case report, Effluence Point report, Noise and Vibration Study, Fire and Explosion Analysis, Fire and Gas Mapping study report., Quantitative risk assessment (QRA), Statutory HSE requirement, Process Hazard Analysis Policy, Process Safety Procedure, Plant Compliance Register, Otakikpo PEPF Management of Change Procedure, Safety Integrity Level study, Update Hazardous Area Classification drawings and report, Training matrix, Safety Critical Element and Performance Standards report, Pre-Start Up Audit Procedure, Training plan, Plant Maintenance Procedures, Plant Isolation Philosophy, Performance of safety critical tasks, Auditing critical barriers.

Project Title: HAZOP Study for the Karpowership Gas Pipeline

Client: Ghana National Gas Company
Location: ACCRA, GHANA

Project Status: COMPLETED

OTK Facilitated the HAZOP Study for the Karpowership Gas Pipeline to identify the hazards Inherent in the design in order to meet its design objectives

Project Title: HAZOP and design review session for Oben Gas Plant Modification

Client: Seplat Petroleum Development company
Location: LAGOS, NIGERIA

Project Status: COMPLETED

OTK Facilitated the HAZOP and design review session for Oben Gas Plant Modification of Modules 1 & 2 for Well Testing. The objective of the design review is to review the baseline design against the requirements of the Project’s Basis of Design

Project Title: Pre- Start Up Safety Audit (PSSA).

Client: Pan Ocean/FODE
Location: AGBOR/OGHAREFE, NIGERIA

Project Status: COMPLETED

The PSUA provides a final checkpoint for The Owa Alidinma Flow station and Ovade Ogharefe Gas Processing Plant to confirm that all appropriate equipment, elements, and processes have been addressed satisfactorily and the facility is safe and ready to start up.

Project Title: Noise Study

Client: NETCO/Total
Location: LAGOS, NIGERIA

Project Status: COMPLETED

The noise impact and assessment study were conducted on the major equipment considered for the new AMD2 and IKD1 wellhead platform and the scope of the IKIKE Phase 2 field development project.

Project Title: HAZOP for the Evwreni Gas Lift Compressor Installation project

Client: Ariosh/Heritage
Location: LAGOS, NIGERIA

Project Status: COMPLETED

OTK Facilitated the HAZOP for the Evwreni Gas Lift Compressor Installation project. The objective of the design review is to review the baseline design against the requirements of the Project’s Basis of Design

Project Title: Hazard Identification and Risk Assessment (HIRA)

Client: CNS Marine/Agip
Location: LAGOS, NIGERIA

Project Status: COMPLETED

ABO Intervention Campaign. OTK conducted Hazard Identification and Risk Assessment (HIRA) and   performed Process Hazard Analysis (PHA) that will include; HSE Audit plan, Emergency Response Plan and HSE Operative Plan for Abo4NW and Abo10ST Project – Subsea Intervention Vessel for SPS Maintenance.

Project Title: HAZOP for the Produced Water Treatment Project Phase 1

Client: Ariosh/Heritage
Location: LAGOS, NIGERIA

Project Date: 02/2019

Project Summary:

OTK Facilitated the HAZOP for the Produced Water Treatment Project Phase 1. The objective of the design review is to review the baseline design against the requirements of the Project’s Basis of Design

Project Status: COMPLETED

Project Title:HAZID & BOWTIE studies

Client: Pillar Oil Ltd
Location: WARRI, NIGERIA

Project Status: COMPLETED

POL engaged the services of Otormeking Engineering and Design Nigeria Limited to carry out Hazard Identification (HAZID) and Bow Tie analysis on the Umuseti Production Facility Upgrade Project to ensure that the risks associated with the MAH’s are As Low AS Reasonably Practicable (ALARP)

Project Title: Safety and Constructability Studies for Engineering, Procurement, Construction and Installation (EPCI) of Modularized Oil and Gas Facilities at ABURA OML 65

Client: NPDC
Location: BENIN, Nigeria.

Project Status: Completed

Safety and Constructability Studies for Engineering, Procurement, Construction and Installation (EPCI) of Modularized Oil and Gas Facilities at ABURA OML 65

This consist of; – HAZOP Studies – HAZID Studies – SIL Studies – LOPA – Constructability Reviews

Project Title: Incident Investigation

Client: AMNI Petroleum Dev. Comp Ltd
Location: lAGOS, Nigeria.

Project Status: Completed

Incident Investigation;

Department of Petroleum Resources has requested for an independent investigation to the fire incident which occurred on princess Aweni FPSO with the following directives and scope as contained in the DPR letter;

Project Title: HAZID for HI Development Project

Client: Shell Petroleum Development Company
Location: lAGOS, Nigeria.

Project Status: Completed

HAZID for HI Development Project;

The HAZID study is used to identify the hazards associated with the Project facilities and recommend improvements, modifications, or further studies where present preventive/mitigated measures require additional ones.

Project Title: Review and Development of Integrated HSE Management System

Client: AMNI Petroleum Dev. Comp LtdCompany
Location: lAGOS, Nigeria.

Project Status: Completed

Review and Development of Integrated HSE Management System;

Development of standard HSE-MS documents integrating the 11 basic elements of HSE-MS, Development of Hazard Management Plan/Philosophy, Development of Emergency Shutdown Philosophy etc

Project Title: Filtration Unit At FRM LACT in OML 30

Client: IGPES/Heritage
Location: lAGOS, Nigeria.

Project Status: Completed

Filtration Unit At FRM LACT in OML 30

OTK Facilitated the HAZOP Study for the Filtration Unit At FRM LACT in OML 30 to identify the hazards Inherent in the design in order to meet its design objectives

Project Title: HAZID & BOWTIE studies

Client: Pillar Oil Ltd
Location: lAGOS, Nigeria.

Project Status: Completed

HAZID & BOWTIE studies

POL engaged the services of Otormeking Engineering and Design Nigeria Limited to carry out Hazard Identification (HAZID) and Bow Tie analysis on the Umuseti Production Facility Upgrade Project to ensure that the risks associated with the MAH’s are As Low AS Reasonably Practicable (ALARP)

 

Project Title:Otakikpo 1-Million Barrel Onshore terminal Project

Client: Green Energy International Ltd
Location: warri, Nigeria.

Project Status: Completed

Otakikpo 1-Million Barrel Onshore terminal Project;

The primary objective of the HAZOP Study is to identify the hazards inherent in the operations of the 1-Million Barrel Onshore terminal Project in order to meet its design objectives.

Project Title:OTK Facilitated the HAZOP for the Produced Water Treatment Project Phase 1

Client: Ariosh/Heritage
Location: lagos, Nigeria.

Project Status: Completed

OTK Facilitated the HAZOP for the Produced Water Treatment Project Phase 1

OTK Facilitated the HAZOP for the Produced Water Treatment Project Phase 1. The objective of the design review is to review the baseline design against the requirements of the Project’s Basis of Design

Project Title:ABO Intervention Campaign.

Client: CNS Marine/Agip
Location: lagos, Nigeria.

Project Status: Completed

ABO Intervention Campaign.

OTK conducted Hazard Identification and Risk Assessment (HIRA) and performed Process Hazard Analysis (PHA) that will include; HSE Audit plan, Emergency Response Plan and HSE Operative Plan for Abo4NW and Abo10ST Project – Subsea Intervention Vessel for SPS Maintenance.

Project Title:OTK Facilitated the HAZOP for the Evwreni Gas Lift Compressor Installation project. The objective of the design review is to review the baseline design against the requirements of the Project’s Basis of Design

Client: Ariosh/Heritage
Location: lagos, Nigeria.

Project Status: Completed

OTK Facilitated the HAZOP for the Evwreni Gas Lift Compressor Installation project. The objective of the design review is to review the baseline design against the requirements of the Project’s Basis of Design

Project Title:Noise Study

Client: NETCO/Total
Location: lagos, Nigeria.

Project Status: Completed

Noise Study.

The noise impact and assessment study was conducted on the major equipment considered for the new AMD2 and IKD1 wellhead platform and the scope of the IKIKE Phase 2 field development project.

Project Title:Pre- Start Up Safety Audit (PSSA).

Client:Pan Ocean/FODE
Location:Agbor/Ogharefe

Project Status: Completed

Pre- Start Up Safety Audit (PSSA).

The PSUA provides a final checkpoint for The Owa Alidinma Flow station and Ovade Ogharefe Gas Processing Plant to confirm that all appropriate equipment, elements, and processes have been addressed satisfactorily and the facility is safe and ready to start up.

Project Title:Oben Gas Plant Modification

Client:Seplat Petroleum Development company
Location:lagos, nigeria

Project Status: Completed

Oben Gas Plant Modification

OTK Facilitated the HAZOP and design review session for Oben Gas Plant Modification of Modules 1 & 2 for Well Testing. The objective of the design review is to review the baseline design against the requirements of the Project’s Basis of Design

Project Title:Karpowership Gas Pipeline

Client:Ghana National Gas Company
Location:Accra, ghana

Project Status: Completed

Karpowership Gas Pipeline

OTK Facilitated the HAZOP Study for the Karpowership Gas Pipeline to identify the hazards Inherent in the design in order to meet its design objectives

Project Title:Technical Safety Studies and Procedures/Philosophies

Client: Green Energy International Ltd/LEKOIL
Location: ph, rivers state

Project Status: Completed

Technical Safety Studies and Procedures/Philosophies

Technical Safety Studies and Procedures/Philosophies. The following are been developed; Operational Safety Case report, Effluence Point report, Noise and Vibration Study, Fire and Explosion Analysis, Fire and Gas Mapping study report., Quantitative risk assessment (QRA), Statutory HSE requirement, Process Hazard Analysis Policy, Process Safety Procedure, Plant Compliance Register, Otakikpo PEPF Management of Change Procedure, Safety Integrity Level study, Update Hazardous Area Classification drawings and report, Training matrix, Safety Critical Element and Performance Standards report, Pre-Start Up Audit Procedure, Training plan, Plant Maintenance Procedures, Plant Isolation Philosophy, Performance of safety critical tasks, Auditing critical barriers.

Project Title: Otakikpo LPG Extraction Plant;

Client: Green Energy International Ltd/LEKOIL
Location: Abuja, Nigeria

Project Status: Completed

Otakikpo LPG Extraction Plant;

Otakikpo LPG Extraction Plant; The primary objective of the HAZOP Study is to identify the hazards inherent in the operations of the LPG Extraction plant in order to meet its design objectives.

Project Title: Pre- Start Up Audit (PSUA).

Client: Green Energy International Ltd/LEKOIL
Location: ph, Nigeria

Project Status: Completed

Pre- Start Up Audit (PSUA).

Pre- Start Up Audit (PSUA). The PSUA provides a final checkpoint for the Permanent Early Production Facilities at Otatikpo to confirm that all appropriate equipment, elements, and processes have been addressed satisfactorily and the facility is safe and ready to start up.

Project Title: Operational Safety Case Report

Client: Pillar Oil and Gas Limited
Location: ph, Nigeria

Project Status: Completed

Operational Safety Case Report

Operational Safety Case Report will demonstrate that Operations risks are reduced to ALARP. These include HES risks, Operations risks and other potential consequences in the facility which is critical to the business.

Project Title: Risk Assessment

Client: Deltatec Engineering & Chevron Nig Ltd
Location: ph, Nigeria

Project Status: Completed

Risk Assessment

OTK facilitated the Risk Assessment to identify the hazards in the Pipeline Installation and Pipeline Pre-Commissioning of the Escravos Export System Project

 

Project Title: Risk Based Inspection

Client: Monipulo Limited
Location: ph, Nigeria

Project Status: Completed

Risk Based Inspection

The Risk Based Inspection (RBI) will enable the client manage the facility more efficiently considering corrosion and life cycle of all the equipment’s installed, pipelines, vessels, platforms etc

Project Title: Risk Assessment

Client:Deltatec Engineering & Chevron Nig
Location: ph, Nigeria

Project Status: Completed

Risk Assessment

OTK facilitated the Risk Assessment to identify the hazards in the installation of the concrete mattresses at proposed pipeline route and all crossing locations prior to commencement of pipelay of the Escravos Export System Project

Project Title: HAZOP Study

Client:NPDC
Location: ph, Nigeria

Project Status: Completed

HAZOP Study

OTK Facilitated the HAZOP Study for the Tie-in of Oghareki – Sapele flowlines to SEPLAT’s Sapele flowstation inlet manifold to identify the hazards Inherent in the design in order to meet its design objectives.

Project Title: HAZOP Study

Client:Gramen/Chevron Nig Ltd
Location: warri, Nigeria

Project Status: Completed

HAZOP Study

OTK facilitated the Risk Assessment for the 30” Onshore Swamp Pipeline and the Horizontal Directional Drilling (HDD) which is part of Escravos Export System Project.

Project Title:HAZOP for Egbema 3KM NAG Flowline

Client:npdc
Location: warri, Nigeria

Project Status: Completed

HAZOP for Egbema 3KM NAG Flowline

OTK Facilitated HAZOP for Egbema 3KM NAG Flowline to identify the hazards Inherent in the design in order to meet its design objectives

Project Title:Otakikpo Integrated HAZOP Project:

Client:Lekoil/GEIL
Location: warri, Nigeria

Project Status: Completed

Otakikpo Integrated HAZOP Project:

Otakikpo Integrated HAZOP Project: OTK was commissioned to HAZOP the Integrated EPF HAZOP that will identify the hazards inherent in the design in order to meet its design objectives.

Project Title:Offshore Excravos Export System Project

Client:Deltatec Engi/Chevron Nig Ltd
Location: lagos, Nigeria

Project Status: Completed

Offshore Excravos Export System Project

Offshore Excravos Export System Project Dropped Object Study (DOS) will evaluate the potential risk associated with dropped objects considering frequency of lifts, probability of drops, and severity of impact. Diving Operations Safety Study involves a unique combination of occupational health and safety issues performed in an unforgiving environment where errors can quickly develop into fatal accidents. Pipeline Oil Spill Trajectory Model is essential tool for risk assessment relating to potential environmental impacts in sensitive areas and for planning spill response measures. In the event of a spill, the models can be used operationally to assist the response team

Project Title:Otakikpo EPF Project

Client:Lekoil and Green Energy
Location: ph, Nigeria

Project Status: Completed

Otakikpo EPF Project

Otakikpo EPF Project: OTK was commissioned to HAZOP the Early Production Facility that will identify the hazards inherent in the design in order to meet its design objectives.

Project Title:Onshore Excravos Export System Project Fire and Explosion Analysis (FEA)

Client: Petroserve Nig & Chevron Nigeria Ltd
Location: lagos, Nigeria

Project Status: Completed

Onshore Excravos Export System Project Fire and Explosion Analysis (FEA)

Onshore Excravos Export System Project Fire and Explosion Analysis (FEA) will; Analyse credible fire and explosion hazards due to hydrocarbon release events. Assess the consequence and frequency of credible fire and explosion hazards due to hydrocarbon release events. Assess credible fire and explosion escalation events. Recommend measures for mitigating the consequences of fire and explosion events. Fire Protection Analysis (FIREPRAN) will address the type and magnitude of potential fire incidents and to determine type of active fire protection and level of passive fire protection necessary for safety of personnel and assets due to direct or indirect results of changes, replacements and modifications. Dropped Object Study (DOS) will evaluate the potential risk associated with dropped objects considering frequency of lifts, probability of drops, and severity of impact. Noise and Vibration Study will control and minimise the risk of hearing and physical damage to personnel, and by ensuring the audibility of warning signals and communications and the provision of acceptable working conditions. Valve Criticality Analysis is conducted to; It provides the designers with a clear guidance on valve access requirements. It enhances the overall design review process because it alleviates unnecessary, lengthy discussions, on valve accessibility as the design progresses to completion. It ensures that operational and maintenance requirements are addressed when deciding on the location of a valve. Safety Critical Elements and Performance Standards involves identification of Major Accident Hazards (MAHs); selection of the Safety Critical Elements by identifying items, equipment’s or structures which can cause, contribute to, prevent or help recover from a major accident event; and to develop the performance standards for the identified SCEs

Project Title:Okan GGCP Debottlenecking Project HSE Studies Fire and Explosion Analysis (FEA)

Client: NETCO & Chevron Nigeria Ltd (CNL)
Location: port harcourt, Nigeria

Project Status: Completed

Okan GGCP Debottlenecking Project HSE Studies Fire and Explosion Analysis (FEA)

Okan GGCP Debottlenecking Project HSE Studies Fire and Explosion Analysis (FEA) will cover the evaluation of the detailed engineering design impact of GGCP Debottlenecking project including flare facility and bridge links to GGCP (Flare Bridge and Okan PP Bridge). Fire Protection Analysis (FIREPRAN) will address the type and magnitude of potential fire incidents and to determine type of active fire protection and level of passive fire protection necessary for safety of personnel and assets due to direct or indirect results of changes, replacements and modifications. Dropped Object Study (DOS) will evaluate the potential risk associated with dropped objects considering frequency of lifts, probability of drops, and severity of impact. Design Safety Case Report that will include but not limited to the following information: Facilities description, Environmental considerations, Human factor engineering, Safety In Design, Safety Management System Operational Safety Case Report will demonstrate that Operations risks are reduced to ALARP. These include HSE risks, Operations risks and other potential consequences in the facility which is critical to the business.

Project Title:Aladja Hazardous Landfill Project

Client: Olutee Engineering
Location: warri, Nigeria

Project Status: Completed

Aladja Hazardous Landfill Project

Aladja Hazardous Landfill Project- OTK facilitated the HAZOP study for Aladja Hazardous Waste Landfill Design with its entire associated infrastructure including and not limited to: leachate management system, site storm water management system, access road and truck parking, weighbridge, and all other sundry items as agreed with the client

Project Title: Tank Farm Expansion Project

Client: Midwestern Oil and Gas Limited
Location: lagos, Nigeria

Project Status: Completed

Tank Farm Expansion Project

Tank Farm Expansion Project/ Otormeking Engineering was commissioned to HAZOP on two (2) new 40,000 Barrels crude Storage Tank. HAZOP Study is to identify the hazards inherent in the operations of the new storage tanks in order to meet its design objectives.

Project Title: ASSA North – Ohaji South

Client: shell
Location: lagos, Nigeria

Project Status: Completed

ASSA North – Ohaji South

ASSA North – Ohaji South/ OTK was commissioned to provide facilitator for Ohaji South HAZOP. The main objective of the HAZOP to study the Process Deviations impact on the Coarse HAZOPs conducted during Concept Phase.

Project Title: Meji GGCP Debottlenecking Project

Client: IESL & Chevron Nigeria Limited
Location: lagos, Nigeria

Project Status: Completed

Flare Dispersion Study

The Flare Dispersion Study will assess the potential un-ignited flammable gas impact on manned areas and equipment from the HP and LP flare release on Meji GGCP and also to assess the potential un-ignited flammable gas impact on manned areas and equipment from surge vessel vent in the event of a PSV lift on the HP separator

  • Confirm the height and location of Flare is sufficient to prevent high levels of radiant heat from impacting on process equipment and areas where personnel may be present;
  • Ensure that in case of flare flame-out scenario and un-ignited gas dispersion, the height and location of the flare is sufficient to prevent plume from impacting on process equipment and ignition sources;
  • Recommend additional protection where results show that flare radiant heat levels exceed the specified limitations, or dispersed clouds have the potential to impinge on ignition sources;
  • Determine the potential temperature rise of certain receptor of interest
  • Determine a temperature profile of flare stack during flaring to assess the benefits of different material coatings for the flare boom
Design Safety Case Report

The design safety case will demonstrate that the risks and hazards inherent in the facility have been identified and there are processes in place to reduce these risks and hazards to ALARP. Considering project design documents and studies, the design safety case report will include but not limited to the following: HAZOP, HAZID, BOW-TIE, etc.

Project Title: Olu Tee Hazardous Waste Landfill Project at Aladja

Client: Olutee Engineering in Conjunction with Chevron Nigeria Ltd
Location: warri, Nigeria

Project Status: Completed

OTK facilitated the HAZOP study for Aladja Hazardous Waste Landfill Design with its entire associated infrastructure including and not limited to: leachate management system, site storm water management system, access road and truck parking, weighbridge, and all other sundry items as agreed with the client.

Project Title: Fire and Gas Detector System

Client: Lonestar Drilling Nigeria Ltd
Location: ph, Nigeria

Project Status: Completed

Installation of notifies system 57 Panel, Gas detectors, Cabling, Calibration and commissioning of the gas alarm system.

Project Title:Tank Farm Expansion Project

Client: Midwestern Oil and Gas Limited
Location: lagos, Nigeria

Project Status: Completed

Otormeking Engineering was commissioned to HAZOP on two (2) new 40,000 Barrels crude Storage Tank. HAZOP Study is to identify the hazards inherent in the operations of the new storage tanks in order to meet its design objectives.

Project Title:Izombe Flow station Fire & Gas Assessment Study

Client: Addax Petroleum Development (Nigeria) limited
Location: lagos, Nigeria

Project Status: Completed

  • Install Flame Detectors as indicated on the Fire Protection System Layout. Open path detector coverage HP, LP and Gas lift Separators are considered critical.
  • Review Izombe Flow station equipment and piping layout against the developed Hazardous Area Classification Drawing:
  • Consider increasing the spacing between the HP and LP Separators to satisfy minimum separation distance requirements.
  • Consider fire-proofing the structural legs of the pipe racks in the vicinity of Gas Scrubbers and Gas Pig Receiver. This would prolong the resistance time to fire radiation and retain structural integrity.

Project Title:Assah North- Ohaji South

Client: Shell Petroleum Development Company
Location: lagos, Nigeria

Project Status: Completed

  • OTK was commissioned to provide facilitator for Ohaji South HAZOP. The main objective of the HAZOP to study the Process Deviations impact on the Coarse HAZOPs conducted during Concept Phase.
    The study scope is limited to changes in process design from Concept Phase to Pre-FEED Phase, comparing the PFSs developed in both phases to assess the impact of changes from Hazards and Operability perspective.
    The major deviations at high level in the Pre-FEED phase compared to the concept stage include the following:

    • For the well products before the separators, the HIPPS systems are excluded.
    • For the Condensate after the condensate coalescer, the settling tank has been removed.
    • No water is expected at the Stabilized Condensate Storage tanks.
    • Some other minor deviations that may be noticed during the review. 

Project Title: EGINA FPSO

Client:Total Upstream Nigeria
Location: lagos, Nigeria

Project Status: Completed

  • OTK was commissioned to describe the systems, equipment and procedures necessary to protect against the major hazards which could lead to injury of personnel, damage to facilities, loss of production or pollution of the environment, and to prescribe the safety measures which are adopted in the design in order to:

    • Avoid exposure of personnel  to potential hazards
    • Minimise the potential for hazardous occurrences (release of liquid hydrocarbons, flammable gases and any other hazardous events).
    • Minimise/control the risk of ignition
    • Contain and minimise the consequences (fire, explosion and pollution) of the hazards
    • Provide means of escape and evacuation from such hazards
    • Ensure the installation is designed to a safe standard

Project Title: H2S Gas Dispersion Study

Client:Exxon Mobile
Location: lagos, Nigeria

Project Status: Completed

  • OTK was commissioned to carry out a high-level H2S gas dispersion analysis in the equipment/location for fixed H2S gas detectors of the Erha FPSO.  The purpose of this study is to provide detailed understanding of the potential consequences of H2S during a major hazardous event (worst case scenario) on the Erha FPSO facility.
    The findings of the assessment will offer, in an advisory capacity, a high-level, qualitative determination of H2S gas dispersion which can be used, in conjunction with a full risk and safety assessment to establish confidence in the operation of Erha FPSO facility and the safety to its personnel
    The DNV dispersion software PHAST will be used for the study. The scope of work will include:
    Review and process the pertinent information regarding:

    • Meteorological conditions of the Erha FPSO;
    • Gas compositions in equipment’s/locations;
    • Set-up and run selected gas dispersion simulations based on the appropriate selection of conditions
    • Prepare and deliver technical note detailing the analysis including detail on methodology, technical approach, assumptions and results. The results will contain data of gas plume dispersion and concentration.

Project Title: Bridge Linked Platform

Client:BG Group
Location: uk north sea

Project Status: Completed

  • OTK was commissioned to provide expertise in reviewing the FEED Contractor’s work and defining requirements for subsequent EPC tenders. OTK provided client with direct working knowledge of the UK Regulatory framework which was essential in engaging the UK Regulator and developing the necessary submission requirements. OTK continues to provide the client with dedicated support in the areas below.

    • Safety and Risk Studies, including Quantitative Risk Assessment of the offshore assets to identify all hazards and assess the risks to personnel. OTK used the QRA output to complete further assessments of the Dropped objects Risks on the assets.
    • OTK managed the detailed hydrocarbon release and explosion analysis using Computational Fluid Dynamics (CFD) software. This assessment determined the probability of exceeding a structural design loading allowing the design to be accurately specified. OTK also conducted studies to review the provision of Sub-Sea Isolation Valves to the main sea lines.
    • OTK, on behalf of client prepared the draft submissions of the primary UK Regulators: Design Notification (Offshore Safety Case Regulations)

Project Title: Debottlenecking of FCC and Catalytic Polymerisation units

Client: Preemraf Lysekil Refinery
Location: SWEDEN

Project Status: Completed

  • OTK was approached to perform detailed design HAZOP. The purpose of HAZOP study was to systematically review the process and operation of the proposed modifications and replacement of equipment in the FCC and Catalytic Polymerisation units in order to identify the potential hazards and operability problems. OTK reviewed the adequacy of the protective measures and proposed solutions or identify areas for further study. Each modified / replaced equipment of the installation was given line-by-line or stage-by-stage examination by the HAZOP team. This was done by using a set of guidewords in combination with system parameters to give meaningful deviations from the design intent.  The team concentrates on those deviations that could lead to potential hazards to safety, health or the environment. In addition, the team also searched for potential operating problems.

Project Title: BG Everest East Expansion

Client:BG Group
Location: uk north sea

Project Status: Completed

  • OTK undertook the HAZOP using a structured approach according to established
    Amec HAZOP techniques. This involved identifying and assessing potential hazards associated with the proposed modifications by applying primary and secondary guidewords to associated modes of operation and ensuring that suitable risk reduction measures are in place to manage identified risks.

Project Title: Sub Sea Tie-back Structure

Client:Canadian Natural Resources
Location: uk north sea

Project Status: Completed

  • OTK was commissioned to undertake Detailed Design Study and investigate the extent of modifications required, constructability issues, structural impacts, SIMOPS issues and regulatory requirements associated with the proposed Subsea tie-back structure Field which necessitates modifications and additions to the existing equipment.
    As part of its hazard management process, validation of the previous safety studies will be carry out by OTK technical safety team. The basis of the Detailed Design scope is the FEED report, assumptions and conclusions prepared and issued by another contractor. This has been expanded upon through the addition of Sstructure recommendations.

Project Title: DELUXE REQUIREMENT LESS THAN 30PSI

Client:BG Group
Location: uk north sea

Project Status: Completed

  • OTK Safety team will address the deluge system/requirement in the detailed design. This was deemed not required at the FEED stage of the design. The deluge system shall provide adequate coverage for the relevant fire and explosion scenarios, with respect to both volume and area coverage, horizontal and vertical surfaces. It may be regarded as a fire area and may be covered by several deluge valves. All deluge valves covering the fire area shall be released when fire is detected anywhere in the fire area. This applies also for manual release of any deluge valve covering the fire area. The Fire Water system shall be designed and calibrated such that deluge nozzles will receive water at design pressure not later than 30 s after a confirmed fire signal has been given.

Project Title: Explosion and Blast Analysis

Client:BG Group
Location: uk north sea

Project Status: Completed

  • OTK will provide risk assessment regarding the ignition of flammable gas cloud in case of gas leak from production risers. OTK will use Computational Fluid Dynamics (CFD) to simulate different leak scenarios to predict the overpressure due to gas explosion and perform a fire analysis. An explosion analysis will provide protection strategy with the objective of minimizing the explosion risk through the following:

    • Preventing explosions to occur
    • Minimizing the explosion pressure.
    • Controlling the consequences of explosions

Project Title:Fire Risk Analysis (FRA)

Client:BG Group
Location: uk north sea

Project Status: Completed

  • OTK was approached to conduct Fire Risk Analysis. FRA identifies potential fire hazards (i.e. jet fire, spray fire or pool fire) and quantifies the extent of potential consequences.  Active and passive fire protection shall be arranged to ensure that a fire is prevented from spreading to other areas within a specified period of time and to protect load carrying structure against critical heat loads. For Major Hazards like riser fires or burning blow outs, the required time period before impairment shall be defined. Shielding of escape-routes and evacuation stations shall be as required to ensure escape from all areas and evacuation from the installation. The fire loads to be considered within an area may be limited through location of ESD or PSD valves.

Project Status: COMPLETED

FOR FURTHER INFORMATION ABOUT RISK ASSESSMENT TRAINING

GET IN TOUCH WITH US

CONTACT US

OFFICE

Emilia 11, Primewater View Gardens 2,
Oba Saheed Elegushi Street, Off Freedom way, Lekki Phase 1, Lagos.

uk address

33 Skene Crescent, Westhill. AB32 6BN.
Aberdeenshire, Scotland.

Email; info@otkltd.com

Tel:234 (0) 8093563356, +234(0) 8060156326
UK: +44(0)1224966159; +447869107574

sectors

Social Media