DESCRIPTION

The project involved conducting a Pre-Start Up Safety Review (PSSR) and Operational Readiness (ORR) for the Sapele Integrated Gas Plant (SIGP). The primary purpose was to determine the project’s readiness to introduce hydrocarbons and be handed over to Seplat’s operations, while also ensuring the facility and personnel were prepared to start the plant within acceptable risk boundaries.

PROJECT DETAILS

  • Project Title: Pre-Start Up Safety Review and Operational Readiness for Sapele Integrated Gas Plant (SIGP)
  • Client: Seplat Energy Plc
  • Status: Completed.
  • Date: 10/2024
  • Location: Sapele, Nigeria

KEY ACTIVITIES

  • Determining the project's readiness to introduce hydrocarbons.
  • Assessing the readiness for a handover to SEPLAT Operations.
  • Ensuring the facility is ready to be started.
  • Ensuring personnel are ready to operate the facility.
  • Confirming the project can be started within acceptable risk boundaries.