The project was a FEED (Front-End Engineering Design) update for the OML 30 UPS Produced Water Project. The system consists of three parallel treatment trains designed to remove residual oil and suspended particles from produced water to meet injection water quality specifications.
DESCRIPTION
PROJECT DETAILS
- Project Title: OML 30 UPS Produced Water Project FEED Update
- Client: Heritage Energy Operational Services Ltd (HEOSL)
- Status: Completed.
- Date: 05/2024
- Location: Lagos, Nigeria
KEY ACTIVITIES
- Conducting a Model Review.
- Facilitating a HAZOP workshop.
- Performing a Design Review..